St Kilda Accommodation Block and Energy Centre

LOCATION

St Kilda, UK

CLIENT

QinetiQ

SECTOR

Polar Science and Remote

DATE

2016 - 2019

St Kilda Accommodation Block and Energy Centre

A new facility for the Ministry of Defence on the ‘island at the edge of the world’

St Kilda is the most remote British archipelago, 100 miles off the west coast of Scotland. The Ministry of Defence (MoD) have been operating a year round station on Hirta, the largest island, since 1957. The archipelago is owned by the National Trust for Scotland and is a World Heritage Site for both natural ecological and archaeological significance.

St Kilda achieved World Heritage status for its outstanding natural heritage and was among the very first sites put forward by the UK for inscription on the World Heritage List in 1986.  In 2004, the inscription was extended to include the surrounding marine environment and in 2005 the archipelago became the UK’s first and only mixed World Heritage Site, and one of only 35 worldwide when the islands’ relict cultural landscape was also inscribed on the World Heritage List.

High winds are a regular feature with maximum gusts of 300 km/h recorded on Hirta. The facility provides accommodation for 8 permanent staff with space for 12 temporary staff. The project comprises an accommodation building and an energy centre for the island’s three generators. The 1,000 sqm accommodation building was constructed on a composite insitu and precast concrete slab foundation while the steel framed energy centre was constructed on an insitu slab foundation.

The lower segments of the new buildings are curtained with stone excavated from the site and selected to blend into the St Kildan landscape as well as offering an architectural echo of the nearby abandoned cottages and cleits of Village Bay. The superstructure of the accommodation building is formed in Cross Laminated Timber (CLT) floor, wall and roof panels. Insulation and cladding have been added to the outside of the CLT, with the panels left exposed to provide the interior finish, creating a warm, timber aesthetic.

The building is clad in board-on-board Siberian Larch fixed on battens and counter battens to ensure airflow behind. The weathered untreated Larch boards merge with the surrounding scenery. Larch was selected both for its aesthetic quality and performance in a marine environment. The roofs are constructed in CLT finished with a roofing membrane and planted with native St Kildan grasses to minimise visual impact when seen from above.

The construction has taken two years to complete and the facility was handed over to QinetiQ in 2019 – the rough Atlantic waters mean that there is only one short season in the summer of each year when it is possible to guarantee regular access by boat.

Project Details

HBA TEAM
Hugh Broughton
Robert Gillan
Jessica Knight
Devon Moar
Gianluca Rendina

COLLABORATORS
Allen Gordon (Structural engineer)
Dominic Frampton (Services engineer)
Galliford Try International (Main contractor)
Wittets Architects (Client technical advisor)

PHOTOGRAPHY
Hugh Venerables